Skip to main content

Overview

Every plan includes a monthly allowance of Credits. Credits are spent on the operations your workspace and your agents perform against the context repository. Storage, file and folder operations, members, and Groups are not metered. Included Credits reset every month. They don’t roll over on monthly plans; on annual plans, unused Credits carry into the following month.

Credit costs

Five operations consume Credits. The three repository operations are metered per unit, at the rates below. The two agent operations are metered on the work each turn actually does.

Context repository

Writes are billed on merge. A write consumes Credits once its change is applied. Changes that are rejected, or that expire in review, cost nothing.

Context curation

Agent operations have no fixed price. Credit consumption depends on the work performed, so the figures below are averages rather than fixed rates. An update that reads and writes more costs more than a smaller one.
Continuous updates run automatically for enabled sources. Every new or changed record from a source with Continuous updates turned on starts its own agent pass, so a source that changes often can consume Credits without anyone prompting it. Use the source setting to control whether agents run and its sync frequency to control how often Qontext checks for changes.

Overage fees

Overage is optional and cappable on Build and Scale. Past your allowance, Credits are billed at the Enterprise pay-as-you-go rate, which falls as your total volume grows. For example:
  • Build, 1.4M Credits used. 400k Credits over the 1M allowance — €180.
  • Scale, 6M Credits used. 1M Credits over the 5M allowance — €400.
Because the bands run on total Credit volume, Scale’s included 5M puts its first overage Credit a tier down, at €0.40.
Explore has no overage. Prices exclude all taxes, levies, and duties.

Feature overview


Need help?

If you encounter any problems or questions, contact us at support@qontext.ai.